KitLog pro

Powered By Kitlog Pro v2.0

Marks Web Site
' style=
Date:  3-4-2008
Number of Hours:  3.25
Manual Reference:  9-5
Brief Description:  Aft canopy frame preparations

After returning from a much needed break from the earlier work session in the day I began preparing the aft canopy frame components. The F-631A channels needed their flanges adjusted to greater than 90 degrees.Then I fabricated four spacer blocks to go between the F-631A channels and the roll over bar. I also drilled the C-704 splice plate and match drilled it to one side of the F-631A channels. Then I clamped the F-631A channels to the roll over bar.
' style=

Forward canopy skin trimmed to alleviated interference

Forward canopy skin trimmed to alleviated interference

' style=

Rear canopy frame preparations

Rear canopy frame preparations

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.